Originally, we thought we’d finish the basement in “Phase 2”, but then we started to realize that Phase 2 might be 200 years from now, so we decided to get it all done at the same time.
There was a rather significant slope to the drain in the original part of the basement floor, which would have resulted in cracks in any flooring we put down, so Joe poured self-leveling concrete to fix this problem.
Joe then called in Moises, who made quick of installing the basement floor. I’m happy with how it turned out!
I’m so amazed at the transformation, you guys are amazing in your attention to details, your home is beautiful and all your hard work will bring you many, many years of happiness and may God bless you 🙏