After Joe finished digging the trench for the underground electric, and completed getting the PVC pipes ready, it was time to pull the overhead electric lines from the electric pole. The lines now come down a pipe that Joe attached to the side of the electric pole, and through the PVC pipes located in the ground. Once the lines were at the base of the house, the lines needed to be “pulled” into the house, and connected to the main breaker panel in the basement. Warren, Dan and Bobby were instrumental in making all of this happen, and ComEd and the city inspected and approved all of their work. Thanks, guys!!